Push-In Vertical Terminal Blocks

Types of Terminal Blocks

Change category view
Results: 870
Select Image Part # Mfr. Description Datasheet Availability Pricing (CAD) Filter the results in the table by unit price based on your quantity. Qty. RoHS Number of Positions Pitch Current Rating Color Connection Method Wire Gauge Range
Altech 39.8158
Altech Fixed Terminal Blocks PCB Terminal Push-In 8 Pole, 5.0mm 347Factory Stock Available
Min.: 1
Mult.: 1
8 Position 5 mm 10 A, 20 A, 24 A Gray (Dark Gray) Push-In
Altech 39.8159
Altech Fixed Terminal Blocks PCB Terminal Push-In 9 Pole, 5.0mm 300Factory Stock Available
Min.: 1
Mult.: 1
9 Position 5 mm 10 A, 20 A, 24 A Gray (Dark Gray) Push-In
Altech 39.8161
Altech Fixed Terminal Blocks PCB Terminal Push-In 11 Pole, 5.0mm 300Factory Stock Available
Min.: 1
Mult.: 1
11 Position 5 mm 10 A, 20 A, 24 A Gray (Dark Gray) Push-In
Altech 39.8162
Altech Fixed Terminal Blocks PCB Terminal Push-In 12 Pole, 5.0mm 300Factory Stock Available
Min.: 1
Mult.: 1
12 Position 5 mm 10 A, 20 A, 24 A Gray (Dark Gray) Push-In
Altech 39.8554
Altech Fixed Terminal Blocks PCB Terminal Push-In 4 Pole, 7.5mm 195Factory Stock Available
Min.: 1
Mult.: 1
4 Position 7.5 mm 5 A, 35 A, 41 A Gray (Dark Gray) Push-In
Same Sky Fixed Terminal Blocks 7 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

7 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 7 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

7 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 8 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

8 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 8 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

8 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 9 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

9 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 9 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

9 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 10 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

10 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 10 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

10 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 11 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

11 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 11 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

11 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 12 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

12 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 12 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

12 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 13 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,456
Mult.: 36

13 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 13 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,456
Mult.: 36

13 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 14 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,456
Mult.: 36

14 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 14 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,456
Mult.: 36

14 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 15 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,456
Mult.: 36

15 Position 3.5 mm 5 A, 7 A Orange Push-In
Same Sky Fixed Terminal Blocks 15 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,456
Mult.: 36

15 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 16 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,240
Mult.: 27

16 Position 3.5 mm 5 A, 7 A Gray Push-In
Same Sky Fixed Terminal Blocks 17 Poles, Screwless, 45, 3.50 mm Pitch, 24-18 (AWG) Non-Stocked Lead-Time 12 Weeks
Min.: 3,240
Mult.: 27

17 Position 3.5 mm 5 A, 7 A Orange Push-In