M8 Connectors

Amphenol CONEC M8 Connectors with snap and screw/snap termination lock quickly and securely and can be inserted without tools. Overmolded connectors with snap termination can be quickly and easily plugged into sockets, sensors, and actuators without further work steps or tools. The compact locking system on these connectors is secure and complies with protection class IP67 with up to 6 poles. CONEC circular connectors and sockets of size M8 with snap and screw/snap termination are available in the standardized codings A and B for signal transmission. The snap connectors are ideal for designs with limited installation space and can be mounted with optional angled or straight cable outlets. Variants with M8x1 thread on one end can be mounted firmly, e.g., on the threaded socket on the control cabinet; the other end with snap lock can be used flexibly on the assembly and production line. Combined CONEC sockets with screw/snap termination feature both locking types, connectors with thread M8x1, and connectors with snap termination that can be mounted. In addition to the wire and solder pin straight termination types, the Amphenol CONEC M8 Connectors also include sockets for the SMT or THR soldering methods. Insulating bodies are available in 3, 4, 5, and 8 positions. 

All Results (783)

Select Image Part # Mfr. Description Datasheet Availability Pricing (CAD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Amphenol CONEC Circular Metric Connectors SAL-8B-FKH5-P55 Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-FSH8-P55 Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Circular Metric Connectors SAL-8S-FKH8-X10/SMT Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Circular Metric Connectors SAL-8S-IK3/THR Non-Stocked Lead-Time 4 Weeks
Min.: 200
Mult.: 25
Amphenol CONEC Circular Metric Connectors SAL-8-IK4/THR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Circular Metric Connectors SAL-8S-IS4/THR Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RK3-3/A1 Non-Stocked Lead-Time 7 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RK3-5/A1 Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Sensor Cables / Actuator Cables 3P M8X1 FML CON SAL-8-RKW3-2/A1 Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RKW3-10/A1 Non-Stocked Lead-Time 6 Weeks
Min.: 50
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RSW3-2/A1 Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RSW3-3/A1 Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RSW3-5/A1 Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RK4-2/K1 Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RKW4-5/K1 Non-Stocked Lead-Time 6 Weeks
Min.: 50
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RKS3-5/K1 Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RSWU4-2/A1 Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Sensor Cables / Actuator Cables SAL-8S-RS4-5/G3 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
Amphenol CONEC Sensor Cables / Actuator Cables SAL-8B-RKS5.1-5/K1 Non-Stocked Lead-Time 8 Weeks
Min.: 40
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8B-RK5.1-2/A1 Non-Stocked Lead-Time 7 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8B-RSS5.1-3/K1 Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8B-RK5.1- Non-Stocked Lead-Time 10 Weeks
Min.: 40
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RK8-RS8-03/A1 Non-Stocked Lead-Time 9 Weeks
Min.: 30
Mult.: 1

Amphenol CONEC Sensor Cables / Actuator Cables SAL-8-RK3-3/K1/05 Non-Stocked Lead-Time 11 Weeks
Min.: 50
Mult.: 1
Amphenol CONEC Sensor Cables / Actuator Cables SAL-8S-RSW4.78- Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1