MLX90418KLD-AAA-004-SP

Melexis
482-MLX90418KLD04-SP
MLX90418KLD-AAA-004-SP

Mfr.:

Description:
Motor / Motion / Ignition Controllers & Drivers 1coil fandriver, No-Hall, 12V, Clamp=22V, 4.0A, blank OTP

Lifecycle:
New Product:
New from this manufacturer.
ECAD Model:
Download the free Library Loader to convert this file for your ECAD Tool. Learn more about ECAD Model.

In Stock: 4

Stock:
4 Can Ship Immediately
Factory Lead-Time:
2 Weeks Estimated factory production time for quantities greater than shown.
Minimum: 1   Multiples: 1
Unit Price:
$-.--
Ext. Price:
$-.--
Est. Tariff:

Pricing (CAD)

Qty. Unit Price
Ext. Price
$4.34 $4.34
$2.81 $28.10
$2.55 $63.75
$2.15 $215.00
$2.01 $502.50
$1.77 $885.00
$1.51 $1,510.00
$1.37 $3,425.00
$1.34 $6,700.00

Product Attribute Attribute Value Select Attribute
Melexis
Product Category: Motor / Motion / Ignition Controllers & Drivers
Single Coil Fan Drivers
BLDC Fan Drivers
6.7 V to 18 V
- 40 C
+ 150 C
SMD/SMT
DFN-10
Bulk
Brand: Melexis
Moisture Sensitive: Yes
Output Voltage: 12 V
Pd - Power Dissipation: 30 W
Product Type: Motor / Motion / Ignition Controllers & Drivers
Series: MLX90418
Factory Pack Quantity: 1
Subcategory: PMIC - Power Management ICs
Supply Voltage - Max: 18 V
Supply Voltage - Min: 6.7 V
Products found:
To show similar products, select at least one checkbox
Select at least one checkbox above to show similar products in this category.
Attributes selected: 0

CAHTS:
8542390000
CNHTS:
8542399000
USHTS:
8542390090
MXHTS:
8542399999
ECCN:
EAR99

MLX90418 Single-Coil Fan Drivers

Melexis MLX90418 Single-Coil Fan Drivers are 1-coil BLDC motor driver ICs that support replacing legacy sensorless 3-phase motors and can be configured for various applications. The Melexis MLX90418 fan drivers include dedicated features for high-speed server fan applications. With the MLX90418, 1-coil solutions are extended up to 30W in 4cm and 6cm server fans. Code-free plug-and-play functionality avoids the need for software validation of MCU-based solutions, freeing up essential engineering resources for realizing more projects in less time and enabling faster production ramp-up.